Research On Infiniti Double Screen Navigation Software Development Project Schedule Management

Posted on:2016-04-15Degree:MasterType:Thesis
Country:ChinaCandidate:L GaoFull Text:PDF
GTID:2428330572465837Subject:Project management
Abstract/Summary:PDF Full Text Request
A new generation of navigation system Infiniti-In-Touch will be carried in Infiniti new generation models.The navigation system with dual touch screen design,the traditional display information and functional operation of the two functions are distinguished,respectively display in the upper and lower screens.The navigation system will also be equipped with unmanned technology,as the main highlights of the car.Neusoft as the general contractor of the navigation software system,the software part of the whole navigation system is responsible completely by Neusoft,this is the Infiniti double screen navigation software development project.Infiniti double screen navigation software development project belongs to the large Japanese outsourcing project.Different from the low outsourcing,the project is Japanese overall contracting,Neusoft is responsible for all the process,from requirements analysis to system design,to test code,until the final system integrated.Customers are only interested in the final results of the project,in the middle of the implementation process is responsible completely by Neusoft,the project management of Neusoft proposed higher requirements,especially the project schedule management.The main content of this paper is according to the basic theory of project schedule management,according to the needs of the actual process of the Infiniti double screen navigation software development project work,study how to the project were schedule management,to better to ensure timely completion of the project.This paper first describes the basic theory of project schedule management,and briefly describes the project schedule management theory and management methods,introduces the project plan to develop and control the process of planning.Then the Infiniti double screen navigation software development project has carried on the simple introduction,from the project background,general situation of the project to project goals are simple instructions.Combined with the theory and methods of project schedule management,practical development work of the Infiniti double screen navigation software development project,the project schedule to sort out,straighten out the business order,identifying the critical path,the integration of human resources and make project plan.At the same time,according to the relevant theory of project schedule optimization,through adjusting the allocation of human resources,the schedule is optimized.Combining with the actual project planning and schedule control,to carry out the project plan management and schedule control,in accordance with the project management theory and methods,through the project schedule guarantee measures to ensure the steady implementation of the project.Through the application of project management theory in the Infiniti double screen navigation software development project,effectively avoid the risk in the project schedule,improve the quality of the whole project.Through this paper also proved the rationality and practicability of the application of project management theory in the Infiniti double screen navigation software development project,for the same projects in the application of project schedule management have reference function.
Keywords/Search Tags:software development, schedule management, schedule control
PDF Full Text Request
Related items