Study On Project Schedule Management Optimization Of Production Scheduling Simulation Software In Huanghua Port

Posted on:2018-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:Z B KuangFull Text:PDF
GTID:2428330566960141Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the arrival of the information age and the rapid development of science and technology,port competition has been upgraded from the traditional hardware facilities competition to the soft power competition.As the carrier of information technology,software has been applied to port enterprises to assist production operations and enhance the core competitiveness of ports.In the port software development project,the scientific and reasonable schedule management can guarantee the quality and quantity of the software project according to the plan,and it has a strong role in promoting the success rate of the software project.Huanghua port production scheduling simulation software project is a strategic project of Huanghua port to enhance the soft power,but the actual progress already behind schedule,according to the actual progress of the project,through the optimization of project progress,making more scientific and reasonable schedule to ensure the smooth progress of the project implementation,to ensure timely completion of the project,improve the port automation the level and the level of information technology to lay a solid foundation for achieving overall goal of wisdom port ".This paper first describes the background and significance of the research,combing the related research results of project management at home and abroad,and outlines the related theories of project schedule management,laying a solid foundation for future research.Secondly,taking the development project of Huanghua port production scheduling simulation software as the research object,by describing the status of project schedule management,the main problems and influencing factors of the project in the process of schedule planning and control are analyzed in detail.Thirdly,combined with the actual progress of the project,we use schedule management theory,tools and methods to optimize the project schedule management,and form a set of solutions that can effectively solve this project schedule management problem and improve the software development schedule.Finally,through the formulation of effective progress guarantee measures to ensure the smooth progress of the project,according to the expected time to complete the test and put into use.This paper makes some exploratory efforts on the management of the softwaredevelopment project of port production scheduling,and also has some reference significance for other software development projects.By studying the application of schedule management in similar projects,we can draw inferences from others,and apply the theory and method of schedule management to more practical projects.
Keywords/Search Tags:project schedule management, schedule plan, schedule control, huanghua port
PDF Full Text Request
Related items