Font Size: a A A

Ferry Schedule JX Online Booking System Development Project Management And Control Research

Posted on:2016-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2308330503452939Subject:Project management
Abstract/Summary:PDF Full Text Request
In today’s rapid development of public transport, in order to adapt to the rapid development of road infrastructure, road transport operators intensive, ticketing network, transfers convenient, the inevitable trend of the development of information management market, single-station-style ticketing business model, can not meet the requirements of road passenger transport development. So JX provincial Department of Transportation and Transport Authority in line with the provincial highway to further improve service levels, and promote development of the industry, to enhance the ability of the public service purposes, JX proposed construction of passenger ticketing system networking, and JX provincial transportation department has "JX passenger Internet ticketing system " included in the JX provincial highway and waterway transportation information " Twelfth Five-Year plan ", while, JX provincial Department of Transportation and JX provincial road Transport Authority will also be " networked ticketing system " to determine the focus for 2013 information technology projects. Project for the modernization of transport as soon as possible to solve the livelihood problems of the masses and other essential travel difficult. MH company as a project successful unit, is facing tremendous pressure, how to make the project on time, shelf delivery, JX passenger networked ticketing system for R & D projects to find a reasonable schedule control is the key factor in the success or failure of the project. Based on this background creation made on the basis of the purpose of the project management schedule control theory, combined with problems faced by the project development process, such as the huge system functional requirements and more heavy tasks, resource balancing difficult and time constraints and other practical research conditions of constraint, and thus the schedule control management system development projects carried out systematically.After this thesis JX passenger ticketing system networking R & D projects, in project work breakdown, allocation of responsibilities, task sequencing, working hours and other aspects of the preparation of estimates and project schedule control plan by reason of overdue track, identify problems and progress of the project through the lead late in the resource estimation bias duration, time schedule delays, schedule control deficiencies and other aspects of analysis, project schedule control process to identify the problems. Then use PERT and project schedule control method combines CCPM project schedule estimates for the duration of the project, the project network diagram, critical path and other aspects of improvement, in determining the critical chain project implementation schedule for the project, in the implementation process, project progress control in different stages of progress control, dynamic monitoring project progress, schedule control, schedule changes and other aspects of tracking and optimization in order to protect the project can be completed on timeIn this paper, JX passenger ticketing system networking research project progress control program using the original schedule control method based on a combination of PERT and CCPM optimize effectively shorten the duration of the project, to ensure the successful completion of the project, using this method can improve the project schedule and budget constraints to meet the capacity. I hope this research can bring to the company management system development project MH some beneficial effects and benefits, and has a certain significance for enterprises to shorten the development cycle, saving development costs.
Keywords/Search Tags:project management, networking ticket, schedule, schedule control, PERT, CCPM
PDF Full Text Request
Related items