Project Progress Plan And Control Research Of ZD Information Disaster Room

Posted on:2013-02-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y ShiFull Text:PDF
GTID:2268330425966273Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of the Network technology and information technology, relatedfields have developed greatly and are working with them. And with the development, thephenomenon such as network security and data security need be considered emphatically.The information disaster room, as the intermediate node of information transmission, caneffectively make up for the information loophole of host room, ensure the information datasafety and provide the strong support of network service. The disaster room’s constructionstandard and construction requirement are high. It’s environmental condition is changeable.The technology of debugging with host room is complex. At the same time, the projectconstruction period could not be guaranteed and often extended the time limit seriously. Inview of this phenomenon, it is necessary to research the project schedule and control.The research about project progress plan and control need be considered with actualproject. This article has specified the project overall situation by introducing the projectbackground, requirements, manager and specific requirements. The process of project plan isdiscussed mainly. We work out the overall project progress plan by using the work breakdownstructure, key line method, plan evaluation technology method, etc. and network diagram,gantt chart tools, etc. Meanwhile, In view of the project target, we optimize the project time inaccordance with project needs. During the project progress controling, firstly we analyzed thefactors of influencing the project progress and puts forward the solution method and steps tothese factors. Secondly, according to the actual project, we puts forward the whole controlproject of hierarchical control and highlight the key and discussed them. Then we applied thefront method and banana curve comparison method for the project progress control. Thirdly,on the basis of the needs of project control, we raised the safeguard measures about theprocess of project implementation. Thus we established a complete set of project controlsystem and ensured the whole project carried out smoothly. Lastly, we provided theconclusion about project planning and controlling.
Keywords/Search Tags:information disaster room, project management, progress plan, progress control
PDF Full Text Request
Related items