Font Size: a A A

Shenyang Foreign Office Of Major Events Management System Design And Implementation

Posted on:2014-02-08Degree:MasterType:Thesis
Country:ChinaCandidate:D F ZhuFull Text:PDF
GTID:2268330401464676Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Liaoshen economy continues to develop, Shenyang City, a large foreign-relatedactivities have become increasingly frequent To better improve the efficiency of theForeign Office of Major Events, to promote the work of the government efficient,transparent, and efficient development, achieve these goals through the developmentand construction of the OA system,only solve channels. The system uses B/S mode,allowing users to browse units notices, bulletins, handling documents, etc. from anyintranet network nodes, the time to understand their tasks. The Foreign Office of MajorEvents OA system of research and construction of Shenyang City is the content of thisthesis, the significance of practical applications.With the Chinese Universities logistics socialization reform, university logisticalnew requirements in terms of scope of management and quality of service. The originalmanagement method and no longer meet the requirements of the university socialreform and market economy. Construction of network-based information system, so thatprecise logistics management, process to maximize the value of the limited resources,while improving the efficiency of the work of support staff.This paper describes the University of Shenyang Logistics Group InformationManagement System design and development of the entire process, the first to explorethe theory of systems development, combined with the findings of similar universities,needs analysis and feasibility analysis, and then combined with the actual conduct ofShenyang Universitysystem analysis, to make a preliminary design. Six functionalmodules of the system are described in detail: information dissemination module,personnel management module, office automation module, property managementmodule, site construction management module, and system management module.In the system design and development process, development methodology toachieve a combination of ASP.NET development tools and SQL Server2005, focusedon solving web system security, using the form given by user roles define permissionscombined system securitysystem security, database security, internet security,encryption algorithms and other factors to ensure the safe and stable system.. Now, the system has been put into trial operation, the Group’s management and theteachers and students of users praise. Finally, this paper summarizes the prospect of theexpansion of the system.
Keywords/Search Tags:Activity, Architecture design, Office systems
PDF Full Text Request
Related items