Research On WSSC Software Project Risk Of Company A

Posted on:2021-03-15Degree:MasterType:Thesis
Country:ChinaCandidate:C L WangFull Text:PDF
GTID:2428330632962952Subject:Project management
Abstract/Summary:PDF Full Text Request
The development of science and technology has brought us a lot of convenience,and at the same time it has also changed our lives in a subtle way.Various kinds of software have emerged endlessly,and the software structure has become more and more complicated.Great difficulties.However,any software is flawed when it is developed.It needs to be continuously improved after being put into use.The system functions should be strengthened according to user needs to improve user satisfaction.This also brings certain risks to software development,including various aspects,such as management,requirements,processes,and technical aspects.If the risk is too high,it will have a huge impact on software development.In severe cases,it may even Obstructed the continued development of the project.Therefore,when carrying out project development and design,we should carry out risk management in combination with actual conditions,analyze the risks that may exist during the development of the project,determine the causes of these risks,and then take effective measures to reduce or suppress risks.It can be seen that risk management is also very critical in the development and design of software.If risk management cannot be carried out reasonably,it will have an adverse impact on project development.This article mainly analyzes the risks that may occur in the development and design of software projects,combines the research theory on risk management,and finds a lot of literature on this aspect,and manages the risks that may occur during the development of WSSC software developed by Company A..The paper first conducted a detailed analysis of the WSSC project development resources,environment,and needs.According to the risk checklist,this paper chooses a brainstorming method to detect possible risks in the development of the project.After determining the relevant risks,the risk evaluation matrix is used to complete the evaluation process.Subsequently,the article carried out a detailed study of the risks in the project,identified the main influencing factors of risk formation,and then proposed a solution to the problem,that is,to reduce the risk of project development through corresponding methods,while tracking and monitoring some important risks that cannot be completely eliminated.To minimize its impact on the software development process.This paper mainly conducts risk assessment and risk management for software development projects,summarizes relevant research conclusions in this area,and proposes countermeasures based on relevant experience to reduce the risk of WSSC project development.This research content can provide a certain theoretical basis for future companies to develop software,and can also provide certain help for companies currently studying this area.
Keywords/Search Tags:risk management, risk identification, risk estimation, risk evaluation
PDF Full Text Request
Related items