Investigation On Project Schedule And Quality Management Of Skynet In Zhaohua District (2016),Guangyuan Mobile

Posted on:2019-07-29Degree:MasterType:Thesis
Country:ChinaCandidate:J C OuFull Text:PDF
GTID:2428330596459080Subject:Engineering
Abstract/Summary:PDF Full Text Request
Communication engineering project is a kind of comprehensive construction project with wide coverage,high technical difficulty and long construction period.Guangyuan mobile skynet informatization project 2016(skynet project)is the typical representative of this kind of communication engineering project.The project,started in 2016,construction began in 2017,requires completion inspection and acceptance at the beginning of 2018,is a focus of the public security bureau in Guangyuan city project,involving more than 150 monitoring front and central server and background database construction.The construction of this project is of great importance to improve the network and information of public security management.In this paper,the integrated use of the project schedule management theory and method,by means of qualitative and quantitative analysis,on case skynet informationization project progress plan and schedule control,quality management,carried on the thorough analysis and discussion.First of skynet project status,scope of implementation,characteristics,find out the schedule management and quality management problems,and then from the project goal,task decomposition,activity sequencing,activity duration estimates establishment reasonable project progress schedule.According to the actual situation of the project,the adjustment measures suitable for the progress control were proposed.Finally,the progress research and the quality management research of the project were summarized and reflected.Time limit for a project and construction quality is a key indicator in this project,this article by skynet project schedule management research,on the one hand,for the subsequent new skynet project schedule planning and provide reference for quality management methods and tools,the progress of the project plan can be use for reference the experience of the project and optimize,high coding efficiency.On the other hand,the quality control measures proposed in this paper are combined.The practical experience of skynet project plays an active role in the control and management of skynet project.
Keywords/Search Tags:Guangyuan mobile, skynet project, progress management, quality management
PDF Full Text Request
Related items