Font Size: a A A

The Engineering Project Progress Plan And Control Research Of H Province High-definition Television Broadcast System

Posted on:2015-04-06Degree:MasterType:Thesis
Country:ChinaCandidate:M W GaoFull Text:PDF
GTID:2348330518970823Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of modern media and information technology,and the trend of high-definition television programs and the launch of the country's three nets fusion schemes,H province TV station to catch the change history new development opportunity,according to actual condition adjust strategic strategy,to build a new high-definition broadcast system,and then grab the TV and video media advertising market share.To further expand the market share,improve H province TV industry's influence in the country.Based on H province building high-definition television broadcast system planning and control behavior,for the purpose of its background of construction process,the progress of the project planning and control for the research and exploration.And really make the project schedule for the project plan and implementation plan.This is not only to the construction of the project implementation has a certain guiding significance,also for other high-definition television broadcast system of the construction of the planning provides certain theory basis and the concrete construction plan.Based on the analysis and summarizes the domestic and international project schedule management,on the basis of the theory and method,first of all,according to the actual work requirements of H province TV high-definition television broadcast system,project H provincial television broadcast high-definition system are analyzed.Combined with domestic and foreign advanced technology for the division of the project schedule management in detail,draw out the project WBS decomposition worksheet,completed the H province TV high-definition television broadcast engineering project master schedule.The second is given to ensure the safety of the system within the project schedule to finish the project schedule of the specific control and adjustment methods.Finally,list in order to guarantee H provincial television broadcast high-definition project schedule required for the smooth implementation of safeguard measures.
Keywords/Search Tags:Hh-definition television broadcast system project, Poject schedule plan, Poject sch edule control, Poject schedule protection
PDF Full Text Request
Related items