Research On Schedule Plan And Control In Project Of D Company's A-Type Radiation Hardened Circuit

Posted on:2021-12-17Degree:MasterType:Thesis
Country:ChinaCandidate:N N SunFull Text:PDF
GTID:2518306350972679Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Under dual background of Sino-US trade conflicts and china IC products dependent on import,it is inevitable to design and manufacture domestic IC.The development of A-type radiation hardened circuit could help D company to exploit market of domestic astronautic electronic components and increase its market competition.D company has rich experience in the developing of IC,but it's the first time to design and manufacture the astronautic electronic components in high quality those could meet the requirement of customers.And other research institutions have not yet researched and developed this circuit.Thus,making schedule plan and controlling this schedule is very important to A-type radiation hardened circuit.The thesis analyzes fundamental theories of project schedule management,schedule plan and schedule control.Based on basic information about D company and A-type radiation hardened circuit,such as the research content,organization and duties,the work will be detailed and divided by work breakdown structure,every process will be sorted and its time limit will be estimated.Then,critical path will be found by drawing the Network-planning diagram.Finally,project schedule plan will be drawn up,and total project duration will be compressed reasonably and suitably by three optimization means.According to basis and process of controlling the schedule of A-type radiation hardened circuit project,the schedule will be supervised,the deviations will be analyzed,and the change will be adjusted through the overall process of developing the project.Then,actual situation of controlling this circuit that happened will be summarized.Finally,safeguard measures in aspects of organization,technique,economy and contracts.In the summary,tools and theory of schedule plan and control should be researched deeply and be utilized during work.The thesis will play a guiding role for D company to develop astronautic electronic components in same high quality and will establish a template for project management.
Keywords/Search Tags:schedule plan, schedule control, project schedule management, duration
PDF Full Text Request
Related items