Font Size: a A A

Research On The Progress Plan And Control For Neusoft Company NDS Software Project

Posted on:2016-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y YuFull Text:PDF
GTID:2348330512471351Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of software industry network,openness,globalization,the increasingly fierce competition in the software industry.Software outsourcing industry,many market participants,in the trend of manpower cost increase and profit decline in space,how to maintain the core competitiveness of enterprises and sustainable development,how to evade the risk and improve the success rate of software development,how to reduce the cost of raising the utilization rate of resources,each software corporations have to face the problem,these are cannot do without the project plan and control.If the plan is in each stage of the project goals and ideas of all kinds of resources to achieve these goals needed,then control is the effective organization and coordination of various resources,and comprehensive consideration of time,cost,quality and project in the subjective and objective conditions change,the different stages of the execution result does not exceed the allowable deviation of the concrete implementation.The ancients said,"all things Yu Li,Yu is not waste",the plan is the premise and foundation of management,good plan for control provides direction and standard,operation without a plan,control is shoot at random,a waste of resources.A good planning is half the success of the project,but if not effectively controlled,the success of the half is still visible failure,planning and control of mutual restriction and supplement each other.Modern software development is three points,seven points of technology management,often say that project management is to make plans,implementation plan,process monitoring plan implementation,although do not plan without monitoring plan all day long suffering,but will let you face the failure of the project after fruit brings,thus planning and control is how important.In this paper,through the research on schedule plan and control of NDS software project planning and control,improve the understanding and the actual operation ability,and by using the theory of knowledge and methods to solve practical problems of the project.Through the implementation of the project,to find the effective management mode accords with the project characteristics in the theory and method of project management,and refining method,all kinds of project schedule plan and strategy according to the collection,various factors influencing the progress plan and control.Through the research and the implementation of the project,hoping to control the cost to the maximum extent,enable the smooth implementation of the project and acceptance of the project plan and control;provide the reference and basis for the similar software project.
Keywords/Search Tags:software project, Schedule management, plan, control
PDF Full Text Request
Related items