Font Size: a A A

Research On Risk Management Of YK Curtain Wall Project

Posted on:2017-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:B LiFull Text:PDF
GTID:2322330533950052Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
The curtain wall industry is a new industry in China, since 1990 s, the curtain wall industry has developed rapidly, increasing practitioners, driven by the rapid development of China's construction industry. However, the curtain wall industry development is not optimistic, there are still a lot of problems to be solved. With the stable and rapid growth of China's economic development, the level of risk management of curtain wall engineering in China is becoming more and more high. The risk management of building curtain wall is to realize the project goal in the greatest degree by identifying, evaluating and controlling the risk of curtain wall engineering.Based on this, this article from the project risk management theory research perspective, research on risk management of curtain wall project on YK were identified,with Delphy, the form of the questionnaire to determine the value of risk evaluation for the risk of re identification risk of curtain wall project, finally using the analytic hierarchy process evaluation, to determine the main risks curtain wall project, and take effective measures for the.In this paper, through the analysis of YK recognition, Grand Viking Hotel project risk management the final curtain wall is the main risk of the industry design ability,overall arrangement and the rationality of the contract risk and the main factors for the risk to take effective measures, such as training, design staff reasonable arrangement time, strengthen contract management, establish compensation the mechanism of "so as to effectively improve the work efficiency, increase the company and personal income,with powerful facts proved that the implementation of project risk management in curtain wall engineering is necessary and feasible, and also in practice continuous improvement, provide a theoretical basis and practical experience in project risk management manual for as soon as possible to develop a belongs to the wall for this young industry, curtain wall industry, can achieve faster and better with international standards play a positive Effect.
Keywords/Search Tags:curtain wall engineering, risk identification, risk control
PDF Full Text Request
Related items