Font Size: a A A

Construction Glass Curtain Wall Project Risk Management Research Of Shenyang Culture And Art Center

Posted on:2016-08-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhangFull Text:PDF
GTID:2382330518480463Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the accelerating urbanization process,the surface construction has become the symbol of every city.Shenyang Culture and Art Center has been praised by Liaoning provincial Party committe and Shenyang municipal government as a large public building which enhanced the quality of urban culture and enriched the cultural life of the masses.The glass curtain wall project is much higher than any a glass curtain wall project in shenyang in engineering scale,technical complexity,difficulty of construction,construction schedule and capital investment.Similarly,the coercion of the construction risk and the management of risk of construction is very important,its controling measures and the management level affect and decide the success of the project.This paper distinguished risk factors through analysed and estimated the technological development of glass curtain wall construction at home and abroad,based on risk management theory and using the method of DE phil(expert investigation method),work breakdown structure method,application scene scene analysis,cause and effect diagram method and so on.This paper constructed an indicator system which complies with glass curtain,combined with glass curtain wall construction characteristics of the cultural and artistic center in shenyang on project progress,project quality,project cost,safety and environmental protection and other aspects to analyze risk factors.Analysis of decision tree analysis method,the monte carlo simulation method,analytic hierarchy process(ahp)and fuzzy comprehensive evaluation method,four methods,combined with the glass curtain wall construction risk factors analysis of uncertainty,variability,and the characteristics of vagueness,difficult to quantify and determine the hierarchical analysis and fuzzy comprehensive evaluation to the main glass curtain wall construction risk evaluation method;Built a multi-level fuzzy comprehensive evaluation model,culture and art center of shenyang glass curtain wall construction risk,get the shenyang culture art center in the process of the glass curtain wall construction project cost risk>project schedule risk>security>project quality risk;According to the results of the risk assessment for different risk,put forward the corresponding methods of risk control,risk response and risk monitoring measures;,this paper puts forward the effect and Suggestions of risk management glass curtain wall construction of Shenyang cultural and artistic center through Integrating the above results.This paper monitor the risk of the whole construction of Shenyang Culture and Art Center through incorporated risk evaluation index system,risk control methods and measures,process in the whole process of risk management and monitoring,engineering using the multi-level fuzzy comprehensive evaluation model has certain operability and reliability of construction of glass curtain wall project risk management has worthwhile qualification.
Keywords/Search Tags:Glass curtain wall, Risk management, Analytic hierarchy process(ahp), The fuzzy comprehensive evaluation method
PDF Full Text Request
Related items