As China has become one of the most important countries in the world,the high-rise buildings in the movie can be seen everywhere in the real life,and the glass curtain wall is also born.The use of glass curtain wall increases the artistic appreciation of the outer surface of high rise building.The building curtain wall consists of two parts:outer surface panel and structural system(supporting parts and supporting mode).Are the characteristics of glass curtain wall has the characteristics of plastic and relative fixity of buildings,the structure of the outer wall and decorative accessories is not load bearing glass curtain wall.With the rapid development of the economy,the construction curtain wall of our country has been in the forefront of the world,becoming the first great power of the curtain wall.However,during the high speed development of the curtain wall industry,the glass curtain wall fell off and the explosion hurtful events occurred frequently.The quality and safety of glass curtain wall have become the biggest obstacle to the development of the curtain wall.Therefore,it is necessary to carry out effective risk identification and risk control for building curtain wallRefer to the related literature theory:the meaning of risk and project risk and risk management,construction project whole life cycle management theory research,determine the building glass curtain wall project in accordance with the relevant theory.Through the analysis of the characteristics of the construction curtain wall project,regarding building curtain wall risk identification methods are analyzed and compared,combined with other research methods and achievements of construction project risk management,the construction curtain wall project in the whole life cycle risk are screened.According to the method of questionnaire,the paper analyzes the risk of the curtain wall,analyzes the questionnaire,and concludes the risk index of the construction curtain wall project.Then,through the comparison and analysis of the risk identification and evaluation method of the construction curtain wall project,the risk evaluation method of the glass curtain wall project is determined.Through the questionnaire analysis of risk factors,determine the weight of each risk,and then according to the crowd to confirm the important degree of each risk,finally get the whole risk level of the project.Finally,with ADIC engineering as an example for empirical study,through to the ADIC project risk identification and evaluation,and according to the results of risk evaluation of ADIC engineering puts forward the countermeasures to solve these problems.Through four aspects:personnel organizational risk,economic policy risk,technology risk,management risk,workability of curtain wall construction in bidding and construction whole process of risk identification,risk and gives 4 coping strategies.It is the key to the success of the curtain wall project in the hope that the change of risk in the curtain wall project will be timely and effective. |