Font Size: a A A

Research On Construction Quality Management Of Weifang Wan Park Project

Posted on:2015-11-23Degree:MasterType:Thesis
Country:ChinaCandidate:R J YuanFull Text:PDF
GTID:2272330473950031Subject:Project management
Abstract/Summary:PDF Full Text Request
Any business to survive and get the long-term development, we must have a reliable quality assurance. In the process of enterprise management more attention to the quality of management and control. In the current competitive market environment, quality control subjects also had rapid development, has been further improved, some very useful management thinking has been gradually on the quality of their planning, management and control had a significant impact. In this thesis, the construction of Weifang Wan Park project together, through the use of quality control theory and practical application of methods of analysis and a deep study of the management of each construction phase to start work at the work carried out for the deficiencies that exist in the detailed implementation arrangements and job analysis:First, the paper describes in detail the construction projects were the construction quality control of the situation, analyze the basic principle followed in quality control as well as mathematical statistics actually taken. Secondly, through the cooperation of Weifang Wan Park project itself has the characteristics and profile of the actual construction, etc. are introduced to identify project problems and hazards in construction quality assurance, take appropriate measures to improve it. And quality control through the introduction of this important concept for the construction of the various stages of mathematical statistical methods to take more control over the strength of the concrete construction. Finally, the effective control of the project construction quality measures and countermeasures, through the establishment and organization of technical measures to improve quality control and further improve the quality of construction preparation phase and construction phase of a specific level of control to develop a more comprehensive, systematic quality control tasks, objectives and plans. In this paper, the actual construction of Weifang Wan Park project as an aggregate analysis of the case, by using scientific and reasonable method of data analysis, combined with accurate and reliable quantitative analysis tools to analyze the quality of the project, the issue of quality control analysis for the presence of expand next forecast in the hope that these methods and programs can play a helpful on the future quality control.
Keywords/Search Tags:quality management, three-stage principle, PDCA
PDF Full Text Request
Related items