Font Size: a A A

Design And Implementation Of Chengdu Second Beltway Highway Project Management Information System

Posted on:2014-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:J LanFull Text:PDF
GTID:2268330425968938Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of modern computer technology and communicationtechnology, the society increasingly high degree of information technology, informationtechnology has penetrated into the social level and each industry. The trafficinformation target is the extensive use of information technology, the transportationindustry upgrading, to allow the public to enjoy more information, improve thescientific and technological research, safety in production and the managementefficiency and the ability to accelerate the modernization of transport industry,recommended.Based on the analysis of the Chengdu Second beltway highway developmentlimited liability company and project manager working practice, combining withsoftware engineering theory and the actual completion of the system demand analysis.In order to realize the sharing of information resources and systems for multi userdemand, the system uses the B/S model for system development. And the main modules,including workflow engine, Supermap engine, system settings module, usermanagement module, the module, the owners on behalf of the responsible person of thecompany module, Department Engineer module, administrative audit module anddatabase are designed and implemented. The main function of the system after thecompletion of a basic system configuration module, user management module, themodule, the owners on behalf of the responsible person of the company module,Department Engineer module, administrative audit module, database managementmodule.Chengdu Second Ring Expressway (West) the successful development of theproject management system, can effectively improve the Sichuan Chengdu Secondbeltway highway development limited liability company work quality and workefficiency, strengthen the inter departmental information sharing, so as to improve theefficiency and effectiveness of administration. Using a modern engineering constructionmanagement construction in full, high practicability, high maintainability to highwayconstruction management system; combining with the management features specificmechanism of the project management tailored, realizing in the process of engineeringconstruction business comprehensive management and decentralized management: management of electronic networks, remote, mobile project management the officeenvironment.
Keywords/Search Tags:Project management, B/S, Workflow, System
PDF Full Text Request
Related items