Study Of Construction Project Management Model Based On Concurrent Engineering

Posted on:2008-11-26Degree:MasterType:Thesis
Country:ChinaCandidate:L WangFull Text:PDF
GTID:2189360242471307Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Following our country enters to WTO, the architecture industry gets a rapid development; our country's project management level is also facing a higher challenge at the same time. And the traditional project management pattern has already revealed the shortage and flaw,Therefore we need to seek one kind of new management pattern to change the present situation. This article profits the successful experience from the overseas developed country manufacturing industry , and applies the concurrent engineering in our country's project management,attempt to construct one kind project management mode based on concurrent engineering , and to make the project management become more highly effective, more scientific,on this situation reduce the project time and the cost reasonably,improve the quality distinctly,finally reach the owner's requirement and meet the consumer's application requirement.Firstly, the paper analyzes the concurrent engineering theory, and explores its thought that is worthy reference for construction engineering project management. At the same time, the paper analyzes the traditional model of project management, searches for faults and problems existing in it. Then analyzes the necessity and rationality of the application of the concurrent engineering to the project management combined the character of construction project and put forward the problem needed to take care. Based on it, the paper put forward the basic structure that the concurrent engineering theory has been adopt into project management, and it concludes supporting field of concurrent management,management field of concurrent management, and execution field.Mainly study for supporting field of concurrent management is how to constructing the concurrent environment of project management. The paper works out the bids way and contract system conforming to concurrent thought through analysis to the character of engineering project, and establishes the information integrated theory flat of construction management through referring to advanced technology of concurrent engineering. At the same time, the article also introduced virtual construction technology and set up models of application. The research of management field is mainly analysis from the angle of organization. Through referring to the organization way of concurrent engineering, the paper reconstructs the traditional management organization, structures the multi-functional team suitable to project construction, studies to the operation mechanics and operation model of the organization and analyzes two major functions risk management and risk management of the organization. The research of execution field is mainly analysis from the angle of project implementation process. The paper reconstructs the traditional construction process and establishes the construction process suiting to engineering project concurrent management through referring to the process integrated of concurrent engineering, utilizing the IDEF0 model and combing with concurrent management way of multi-functional team.Through the research to three respects above, the paper applies the concurrent engineering theory to project management, structures engineering project concurrent management model and has offered the new theoretical foundation that can be referenced for engineering project management practice in future.
Keywords/Search Tags:Concurrent Engineering, Project Management, EPCM, Organization Reconstruction, Process Reengineering
PDF Full Text Request
Related items