Font Size: a A A

Research On Process Management Of Optimizing Project Of Remote Monitoring System Of Three-dimensional Warehouse Of QDYC Company

Posted on:2021-02-01Degree:MasterType:Thesis
Country:ChinaCandidate:D S JiangFull Text:PDF
GTID:2428330611492347Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,with the increasing sales of cigarettes,QDYC's annual sales volume has reached 360,000 boxes,and will continue to grow in the future.To meet the growing demand for YC sales,QDYC uses two cigarette storage libraries to store cigarettes,respectively Three-dimensional warehouse and dense warehouse,the total storage capacity is 20,000 boxes.However,there are many shortcomings in the current three-dimensional inventory of cigarettes.For example,the existing cigarette information monitoring system can only radiate out of the storage station,and it is impossible to view the information of the cigarettes in the warehouse and the operation of the stacker.,The person who needs to hold the ascent operation certificate takes the stacker to the abnormal cargo position to check the cigarette information.There are hidden safety problems and long inventory time in this process,and the three-dimensional warehouse entry and exit algorithm is the nearest entry,first-in first-out.There is a defect that the shelf is deformed due to uneven storage in and out of the warehouse and uneven loading of the shelf.In this context,in order to quickly check the information of the cigarettes in the cargo location,improve the efficiency of the inventory warehouse,reduce the walking distance of the stacker,reduce the energy consumption and equipment loss of the stacker,comprehensive monitoring and management of the three-dimensional warehouse is becoming a fine One of the major trends in management,QDYC has carried out research on the optimization of project process management for the remote monitoring system of the three-dimensional warehouse.In order to better promote the optimization of the QDYC three-dimensional warehouse remote monitoring system project,the project team introduced project management knowledge to sort out and manage the project to ensure that the project was completed on time,with quality and quantity.This article takes the QDYC three-dimensional warehouse remote monitoring system optimization project as an example,clarifies the research significance of the entire project from the research background,research significance and current status at home and abroad,and then uses the literature query method,research case method and other methods to apply the project management related theory to In actual work,through the analysis of the QCYC three-dimensional warehouse remote monitoring system optimization project status,the difficulties and doubts encountered during the project optimization process are summarized and analyzed using project management knowledge to clarify the project management deficiencies and causes.The optimization of the remote monitoring system optimization project puts forward countermeasures and suggestions,and provides strategic decision-making reference and theoretical basis for project process management.In the process of optimizing the project,the project team found that the project had unreasonable places in the three dimensions of time management,cost management and quality management.For the unreasonable places,the project team applied the concept and method of project management The implementation of 12 measures including project optimization time,scientific investment decision-making and design of a reasonable investment plan carried out process management of the project.Finally,the unique video surveillance system and information transmission method were combined to optimize the project,which effectively reduced The project cost,improved work efficiency,shortened the project time,realized the efficient,comprehensive and accurate management of cigarettes in the elevated three-dimensional warehouse,and reached the project's expected goals.This article combines the actual needs of the project and combines theoretical knowledge and practical experience to make a comprehensive plan for the project and estimate the problems that will be faced,so as to prepare solutions and alternatives in advance,thus improving the overall project.Quality,shorten the time of the entire project,more reasonable use of resources,play a multiplier role for the entire project,and for the same industry unit has improved a set of YC industry three-dimensional warehouse remote monitoring system optimization project process management system.
Keywords/Search Tags:Three-dimensional warehouse, Remote monitoring system, System optimization project, Project process management
PDF Full Text Request
Related items