Font Size: a A A

Research On Quality Management In The Debugging Phase Of Hong Yanhe Nuclear Power Station

Posted on:2018-09-21Degree:MasterType:Thesis
Country:ChinaCandidate:W LiuFull Text:PDF
GTID:2359330518958163Subject:Engineering
Abstract/Summary:PDF Full Text Request
Nuclear power as a new energy has been integrated into the society development,Its incomparable advantages speed up the construction of the plant in all countries,but nuclear accidents reminds us the importance of the construction of nuclear power safety first.Nuclear Power debugging as run before the last stage of the mode in the process of quality will directly affect the later when nuclear power plant operation,safe production.To ensure the smooth progress of the debugging work,we should use effective quality management and control method.Firstly,this paper collects concepts of quality management and the main management principles based on the related domestic and foreign literature,and introduces the key related method.Secondly,this paper summaries related laws and regulations of Nuclear Power quality management.At the same time,this paper summaries and analyses the culture of nuclear safety on the basis of quality management.Thirdly,this paper introduces the debugging work after the main stage,including before and after the debugging system and link handover.Because of the particularity of nuclear power in security requirement and the complexity and importance of nuclear power debugging,this paper chooses total quality management concept for the plant the root in process quality management mode.This paper uses PDCA quality ring for the mode process quality system establishment and implementation as the main tools.Then this paper builds the basic theories of process quality management mode of nuclear power plants.Finally,this paper introduces the basic situation of quality management of Hong Yanhe Nuclear Power and determines the quality of the guidelines and policies.This paper builds quality management system framework of Hong Yanhe Nuclear Power Debugging,which uses total quality management and PDCA quality ring as the guidance and model,and other auxiliary tools,such as fish bone charts,investigation,evaluation.This paper researches the management of quality assurance and control and puts forward concrete implementation strategy.This research's results can promote subsequent debugging management of other nuclear power.The paper has strong reference and application valuable.
Keywords/Search Tags:Nuclear power plant, Quality management, Debugging, PDCA
PDF Full Text Request
Related items