Font Size: a A A

Research On Schedule Management Of Mobile Communication Engineering Project

Posted on:2018-09-15Degree:MasterType:Thesis
Country:ChinaCandidate:X L XieFull Text:PDF
GTID:2348330536480069Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of 4G in China,the competition of mobile communication market is becoming more and more fierce,and the competition of the market is gradually from the competition of price transformed into the competition of service.Project schedule management is an important part of mobile communication engineering project management,and it is the important content and goal of the project management of mobile communication project.Achieve good project schedule control,on the one hand to achieve the project schedule objectives,on the other hand will affect the project cost,safety and quality control.Therefore,it is very important to strengthen the management of mobile communication project.Firstly,this paper analyzes the concept and theoretical basis of project schedule management,domestic and foreign research status,and lays a theoretical foundation for this study.Secondly,the mobile communication engineering construction project management and schedule management theory and A mobile communication engineering project case research combining with the method of combining theory and practice,to explore the A mobile communication engineering project schedule management plan and how to implement the plan control of A mobile communication engineering project progress work breakdown,duration estimation,and rendering the project Gantt chart,established the A mobile communication engineering project schedule,and discusses the implementation and control of project schedule,construct the whole control framework of A mobile communication project schedule,then the distribution from the project progress monitoring,project analysis and project schedule deviation adjustment proposed project progress control of the corresponding countermeasures and measures in three aspects.At last,this paper expounds the safeguard measures of the progress control of A mobile communication project from the aspects of project organization,material procurement,project quality assurance and so on.
Keywords/Search Tags:mobile communication engineering, project schedule management, work breakdown, safeguard measures
PDF Full Text Request
Related items