On Risk Management Of HR Real Estate Project Under The Condition Of Information Asymmetry

Posted on:2018-05-23Degree:MasterType:Thesis
Country:ChinaCandidate:X N HuFull Text:PDF
GTID:2322330569985999Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,the scale of engineering projects has been expanding,the technology is becoming more and more complex.So the control of the project is becoming more and more strict,and the management of information is very important.However,the information asymmetry has long existed because of the external environment and the lack of information of each unit.Today,therefore,the project will face to more uncertainties and potential risks,the asymmetric information theory to cope with the engineering project risk is necessary.On the other hand,it shows a blandly new path for the investigation of project risk and its management.In this thesis,on the basis of related review at home and abroad,through summarizing & filtering,by research methods including literature summarizing,expert investigation method,combination of qualitative and quantitative research,information asymmetry and risk management system of research are researched in detail.First of all,The author has collected theories both at home and abroad that have been applied and have deep research value.Then divides them into two levels: information asymmetry and project risk management to make a elaboration.The author combines information asymmetry with project risk management to carry out further research and discussion.Secondly,the author elaborates the relevant theoretical knowledge of information asymmetry and project risk management,and introduces the contents of risk identification,risk assessment,risk response and so on.According to the overall development background of the real estate project and the enterprise background of the author,the actual situation of the HR real estate project,the author chooses five main participants as the research factors such as the owner,the contractor,the supervisor,the supplier and the designer.The author uses expert investigation method to identify the risk factors,and establishes the risk index system on this basis,which lays a solid foundation for the research of this paper.Last but not the least,the author carries out the risk assessment of the HR real estate project basing on the data and management model of his own project and finds out the possible risk factors of the project through interview and investigation.Most importantly,the author puts forward measures to reduce the risk management of the project by learning various suggestions and opinions.There exists information asymmetry in every field,which always companies with danger.So the feasible & rational methods should be adopted to decrease or disperse the damage of risk by enhancing the project risk management.The research of the thesis has great practical value and promotion significance for rational utilization of project resources,reducing project cost and improving project benefit.
Keywords/Search Tags:Project risk, Risk management, Information asymmetry, Generation mechanism, FAHP evaluation method
PDF Full Text Request
Related items