Font Size: a A A

Create Excellence Of Management In Full Construction Process

Posted on:2017-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:S F LiuFull Text:PDF
GTID:2322330563452057Subject:Engineering
Abstract/Summary:PDF Full Text Request
Engineering construction has been gradually transformed from extensive management into a detailed management model with the development of time.Whether it is quality management or construction site management has a major change in this trend.Improve the overall process of the project management level is of great significance.The area of "Bank of Beijing Science and Technology R & D Center" project is about 150,000 square meters.1 # building is the largest data center in Asia as well as the key projects of Beijing Shunyi District.Owners of the project management requirement.Our company also attaches great importance to the project.In order to comprehensively improve the comprehensive ability of engineering construction,to achieve "Luban award " requirements of the special management level of the preparation of this article.In this paper,the main requirements of the Luban Prize at the same time on-site construction of the various aspects of management points to explain.In the construction quality management,new steel keel,fixed column mold,concrete curing technology and information-based software and other innovative means to improve the structure and the level of the construction of the survival of the green construction side of the material innovation,water saving,energy saving,Safety and civilized construction of the use of the whole monitoring coverage,personnel management system and security experience,and other innovative measures;and new technology applications(national 10 new technologies)are used,including the ten Large,17 small items of new construction technology,such as long auger bored pile,closed pit construction,precipitation,steel and concrete composite structure and BIM software and so on.In the end,the project successfully reached the goal of "elevating project management level to Luban Prize".The project was well received by the construction unit and the supervision unit,and obtained good social and economic benefits.The project won the Gold Cup,the national QC quality management team and the national green construction,safety and civilized construction and many other awards,has been recognized by the whole society.
Keywords/Search Tags:Luban award criteria, Create Excellence, Engineering management, Full construction process
PDF Full Text Request
Related items