Font Size: a A A

Research On Scheduling And Controlling Of Tianshunyuan Housing Project In Zhucheng

Posted on:2015-12-28Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y LiuFull Text:PDF
GTID:2322330542975338Subject:Engineering
Abstract/Summary:PDF Full Text Request
The city as the satellite city of urbanization construction,welcomed the opportunity of development.Day shun yuan community projects as a key project of the construction of the urbanization,much attention has been paid to the project benefit.In order to ensure the project can proceed smoothly and achieve economic profit,driving the development of urbanization,in this paper,the day shun yuan community project progress plan and control are studied.First,this paper introduces the shun yuan an overview of community projects.Including the necessity of project construction,construction scale,main content and the main economic indicators.Analyzed the day shun yuan community problems provide the basis for later project progress plan.Secondly,this paper made the day shun yuan community project schedule of the project.Through WBS,network planning technique and S relevant theoretical methods and technical tools to shun yuan community project schedule management has carried on the thorough research.Through the project has carried on the WBS,the logical sequence of all the work in the process of project construction and duration is analyzed and calculated out day shun yuan community project schedule of the project,and complete the project schedule optimization.Thirdly,this article anlys the day shun yuan community project schedule control process and methods.Set the project advance beforehand control,control,and afterwards control scheme.And dynamic monitoring,schedule analysis methods such as measures to implement effective project schedule control to ensure the realization of the goal of the project schedule management.Finally,this paper established day shun yuan community project safeguards.From the project management organization,technology and capital three aspects put forward concrete measures for guaranteeing the project management.Guarantee the quality of the project and time limit for a project.
Keywords/Search Tags:network planning technique, progress plan, PERT, WBS
PDF Full Text Request
Related items