| The thesis research on the water conservancy project in tianjin group of collaborative management model design, analyzes the situation of water conservancy project construction management in tianjin, put forward the development strategy of the construction unit and project management model framework. Paper’s main work and research results are as follows:(1) The paper discusses the construction project of the collaborative management of the background and significance; Paper discusses the origin and development of project group of management, and project management, the difference between project management and affinity, and related concepts and core elements of collaborative management; Thesis points out the purpose and significance of this research.(2) The thesis analyzes project group of collaborative management mode and the present situation of the construction engineering.First,papers discusses the existing difficulties and improve the project group of management method to the comb, second, the paper introduces the construction project group of management model(combination project group and object oriented program group) and implementation model(including four aspects, the organization system construction, the project selection, planning, resource allocation and dynamic management, and management performance evaluation).(3) The paper gives the results of interviews and questionnaire survey. Site investigation form includes interviews and questionnaire, investigation and research according to the results of tianjin water conservancy project construction unit of the organization mode is generally biased towards the weak matrix model, from the overall management status quo, to review and project director authorized management process and knowledge, ability structure and elements of cooperative management of tianjin water conservancy project construction unit management present situation has carried on the diagnosis analysis, the key points of evaluation and improvement Suggestions. Paper general suggested that the construction unit to strong matrix model, proper increase of authorization, connecting the establishment of a PMO(Project Management Office, the Project Management Office), building the multi-project collaborative Management organization system and Management platform.(4)The paper discusses the trend of the development of tianjin water conservancy project construction, and based on the former three chapters analyze the content and the strategic orientation, from the organization system construction, construction management process, talent training and performance evaluation system and information management platform for collaborative management mode of the construction of the framework are given advice. |