Application And Realization Of Power Grid Construction Project Management System

Posted on:2015-05-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y J SunFull Text:PDF
GTID:2308330473952560Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Duration from start to completion by the time required for a series of construction activities constituted. Progress in the development of the control period is less than the progress of work on the development of effective monitoring and control. So you want to effectively control the construction progress of the project, it is necessary to establish a reasonable project schedule management system, and the most fundamental is to understand the factors that affect the power grid construction projects.This thesis is difficult for the progress of the project management issues, made a series of theoretical description and eventually progress to establish grid construction project management software as a utility send a copy of the system so as to solve this problem.In this thesis, the introduction part of the thesis topics first clear the background and significance of topics, to understand the development of similar studies at home and abroad as well as existing problems, so on this basis, this thesis put forward the content and purpose of this study and major work. Followed by the introduction of the construction progress of the project management concepts, detailed analysis of the impact on the progress of construction projects to several factors, including human factors, relevant units of factors, factors external conditions and the potential risk factors, and thus illustrate the difficulties of construction management and project schedule management process issues that need attention. After an overview of the progress of copy to grid construction project management system development purposes, as well as the main direction. From the specific ideas, specific programs, projects are expected to achieve the functions as well as innovation of power grid construction project management detailing the progress of copy to system development, and focus on analysis of the progress of power grid construction project management system is expected to send a copy of the functions. Finally, the article from the three aspects of the calendar grid construction projects to analyze the progress of the application send a copy of the system, namely, power grid construction project management, systems development work schedule send a copy of the risk assessment, implementation of the system functions and system efficiency. In introducing the risk assessment, the thesis on the assessment of production efficiency, product quality assessment, application of the method of technology assessment describes three aspects; functions implemented in the introduction, the realization of the expected functionality with the previous comparison, and raised more than expected realization of the function; efficiency in the analysis, the article from the internal efficiency and external benefits, intangible benefits and tangible benefit analysis of both the benefits of the system, to promote the system for the future is important.This thesis based on specific theory, a power grid construction project management schedule send a copy to the system. After the application of the system of continuous analysis and improvement, and ultimately enable the system to better promote the use of software, thus effectively for power grid construction to create greater efficiency.
Keywords/Search Tags:Grid construction, Project Management, Schedule management, System, Software
PDF Full Text Request
Related items