Font Size: a A A

Design And Implementation Of Integrated Pipe Network Gis In Xiyong Park

Posted on:2015-11-06Degree:MasterType:Thesis
Country:ChinaCandidate:X L LiuFull Text:PDF
GTID:2308330473450550Subject:Software engineering
Abstract/Summary:PDF Full Text Request
This thesis, in view of the existing the evaluation of existing school management system of the assessment results feedback, research and reform the mechanism is not perfect, post responsibility is not clear, according to the goal of Daxian teachers college the actual situation and the future, proposed and designed a performance management system based on WEB。Thesis, in view of the existing evaluation of Daxian Teachers College of the present evaluation system, evaluation resultfeedback research and reform the mechanism is not perfect, postresponsibility is not clear, according to the goal of the school the actual situation and the future, proposed and designed a performance management system based on WEB.According to the above analysis, the system adopts B/S model and Microsoft Visual Studio 2008 (C# programming language), SQL Server 2005, Rational Rose Enterprise Edition, Microsoft Visio 2010, Loadrunner development environment and tools for the design, implementation and testing. The performance appraisal system design and Realization of each function module, its contents include:design and encoding setting module, user management module, assessment module, query module, performance management module, report module, import and export module, message board module, user management system module system. Finally, using black-box test test of the system, including the system function test (unit testing, system level test), performance test (the rate of the server CPU and memory using, transaction processing, response time, business success rate, system throughput test), and the test results were analyzed.Through the practical application of the performance appraisal system research on this subject, the function module of easy operation, reliability, stability, security system, as well as our objective of basically reached the expected requirements.
Keywords/Search Tags:B/S, Personnel performance management, The personnel performance appraisal, WEB
PDF Full Text Request
Related items