| With the speed of the construction of the project, the construction industrystarted the pace of informatization construction in order to improve the work effi-ciency. Especially the single application software such as CAD, Grand soft got awide range of promotion and application. In order to further improve project man-agement level and ability, transformation management mode, strengthening the ser-vice function of construction projects, and implement the strategy of comprehensiveinformation management, the construction project owner began to explore construc-tion project management information system of OA. But as a result of constructionenterprises with project information is scattered and confusion of the businessprocess, requirements change frequently, collaborative efficiency is low, the charac-teristics of office automation system development and success of the operation rateis extremely low. Therefore, to explore the use of OA management information sys-tem for management become urgent needs.This paper takes requirements analysis which is most important and hardest as-pect in the developed process of OA management information system as the researchobject. Through combine the DQ Company’s organization, functional domains andbusiness to access to the developed object base on the domestic and abroad researchstatus and related theory. Then refine the user’s requirements report through the us-er’s intention. Lastly, the paper uses a real case to verify the requirement report ofOA management information system of construction project.Complete the following main research content:First of all, to investigate the company’s current organizational structure, ana-lyzes the functional domain, process and business of the company. Through the in-vestigation, summarizes the company’s existing management problems, and thenputs forward the overall demand goal of OA construction project management in-formation system, build the system function model of the overall goal.Second, build detailed functional requirements. According to the target modelof OA management information system, put forward detailed the study of the func-tional requirements. Including functional requirements and non-functional require- ments, document management, process management, the key work division, theproject weeks plan, document tracking, knowledge management, mail management,communication management, OA Reminder, system maintenances etc. detail ex-pounded in the functional requirements, also introduce the access requirements.The last, the paper carries on the empirical research in OA management infor-mation. Part of the functional requirements in this paper is feasible. At the same time,in this paper, the module of failed to deliver in accordance with the requirements ofurgency prioritize in order to better development to provide complete solutions.In this paper, the author studies on OA construction project management infor-mation system of the expected results module to provide the reference for the similarenterprise’s information system construction, in order to accelerate the constructionprocess of OA management information system, improve the work efficiency ofconstruction industry, cost savings, make project management more standardized andeffective. |