The Whole Process Cost Control Research Of Y College Accounting Practice Base Construction Project

Posted on:2016-11-08Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhaoFull Text:PDF
GTID:2297330488462688Subject:Project management
Abstract/Summary:PDF Full Text Request
Countries in the development of vocational education is becoming more and more attention, countries invested a lot of construction fund. Y college for the construction of practice training bases has always attached great importance to, in order to better control the cost, Y college in accounting practice base construction project, the introduction of enterprise cost control methods and ideas, in line with the principle that must be used, for every penny in the necessary place, hope to maximize cost savings.Accounting at Y college practice base construction projects, the college is the designer and the user of the project, also is the main body of the project cost control, in the process of the implementation of the project, due to the unreasonable design inaccurate positioning, organization design in each unit information communication with related personnel cost control consciousness, cause serious out of control project cost, Y college introduced the concept of enterprise cost control, according to the characteristics of the project cost components and the project itself, the integrated use of the whole process cost control method, target cost control method and the earned value analysis method, the cost control method, to the project design phase, procurement phase, construction stage and completion settlement stage implemented the whole process of cost control, make project cost control within the scope of the budget, achieved good control effect.Project cost control research for Y college accounting practice base, the purpose is to summarize the practice base construction project cost control the feasibility of the scheme, for the other schools of project cost control to provide the reference for the construction of practice base, make training base for the construction of the project can not only meet the demand of the students’ practice, it saves the financial fund to the maximum.
Keywords/Search Tags:Training base, Cost control, Earned value analysis
PDF Full Text Request
Related items