Metallurgical Training Center Of Jilin Technology College Of Electronic Information On Cost Control Study

Posted on:2013-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:J HouFull Text:PDF
GTID:2247330371479480Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
After33years of reform and opening up, Current skilled talents in vocationaleducation and training in China basically has primary, secondary, high levels linked toeducation, and also has academic education and training framework for jointdevelopment in vocational education system. But it is still a weak link in the skilledpersonnel training,and talented person’s indentation continuously enlarges.《Chinesetalented person reports》 that releases according to Chinese personnel scienceinstitute for research, our country professional technique talented person supplies thetotal amount as40million people in2010, while the need total amount is60millionpeople, the professional technique talented person still will appear the situation of"supply falls short of demand" for several years in the future. So the nation and localgovernment give higher value and support to the construction of each senior highvocational school college training base. For building a provincial experimentalteaching demonstration centers and vocational training base, enhancing the overalllevel of the experimental practice teaching on the province’s colleges and universities,strengthen the metallurgical knowledge and hands-on skills, training high-qualityskilled personnel who can meet the market demand and adapt to the production,construction, management and service the first line, Jilin Technology College ofElectronic Information has invested a total of3million in the central and provincialfor building a metallurgical training Center.In order to effective control the cost of the construction project training center ofmetallurgy, avoid "budget exceeds the estimation, the budget estimates, the settlement budget" three higher phenomenon, the author according to the knowledge of theproject management during graduate students learned and work experience aboutuniversities for many years, with consulting a large number of related literaturematerial, design the cost control scheme from three different phases of the projectdesign, construction and completion, and put forward the concrete implementationplan. Hope I can find cost control is effective method to reduce the waste and increaseefficiency.On the basis of analyzing the present situation of our country’s constructionproject cost control, and combining the domestic status and the characteristics of theconstruction of colleges and universities, this paper analyzes the form of the costabout the project of the metallurgical training center of Jilin Technology College ofElectronic Information. Then key projects can be divided into three stages:projectdesign, project construction, project completion phase. It respectively designs the costcontrol of solutions, and formulated the concrete implementation plan, detailedintroduces each phase of the cost control method. Try to find the different stages ofreasonable control cost effective way. From the whole process of construction projectimplementation, project design phase is the key stage of cost control, this phaseshould do: strict control investment; Introducing competition mechanism, designbidding; Adopt quota design. Project construction stage is the important link of theproject cost control, and is a key stage of project investments, the stage should makethe quality of the construction management, progress management and engineeringchange management, the establishment of a cost management system. This papermainly adopts earned value analysis method to control the cost of the constructionstage, through analysis the construction schedule and the consumption of cost for thefirst two quarter of work, to summed up a good cost control method. In the projectcompletion phase, project completion final accounts is the effective guarantee of theproject cost control, this phase should audit strictly bill and the terms of the contract, pay attention to the cost of the plan to take, in order to better control the project cost.Finally the paper puts forward to the security measures of the project cost controlscheme, and discusses the problems of the paper and the future research prospect.The characteristic of this thesis is to learn from the advanced domestic andinternational engineering and construction project cost control concept. On the basisof costs, management science, operations and so on to the integrated use of projectmanagement, though the way that combined with literature data and practicalresearch、theoretical analysis and practical case studies, the paper conductedempirical studies to the project of the metallurgical training center of Jilin TechnologyCollege of Electronic Information, strive to provide reference for the college trainingCenter construction project cost control, and method with an effective way ofpractical significance.
Keywords/Search Tags:University Training Center, Cost Control, Earned Value Analysis
PDF Full Text Request
Related items