Font Size: a A A

Research On Project Schedule And Control Of SD Resource Library And Teaching Interactive Platform

Posted on:2015-09-27Degree:MasterType:Thesis
Country:ChinaCandidate:T T GaoFull Text:PDF
GTID:2278330488461289Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of information technology and the deepening of curriculum reform, Chinese vocational schools increase intensity in the education of information construction. Information technology has gradually penetrated into the higher vocational school teaching, management and so on each aspect. It gradually reflects the trend of diversification in higher vocational schools teaching models and teaching methods. And thus puts forward the construction demand of resource library and interactive teaching platform, the SD Company is responsible for the development and implementation of the project.Careful, concise and accurate software project progress plan is a key to the success of software project development. In view of the present situation of software project management, it can comprehensively use the software engineering and project management idea, exploring the process and method of software project schedule control. In the resource database and teaching interactive platform of the progress of the project planning process.The task decomposition, responsibility allocation, relationship and work time estimates, then draw the repository and teaching interactive platform of project network diagram and the Gantt chart, forming the project schedule. And on this basis, use the schedule optimization method to optimize a project.Project progress in the implementation of the plan depends on the effective control of project schedule, for dynamic monitoring in the process of project implementation, to take daily monitoring and regular monitoring, and report to the project schedule to show the way. Finally, through the contrast analysis and the project schedule update, to complete the whole process of project progress control, ensure the repository and teaching interactive platform project be completed.
Keywords/Search Tags:Resource library, Interactive teaching platform, Project schedule, Network planning optimization, Schedule control
PDF Full Text Request
Related items