Risk Management Of Transmission Line Project Construction Stage

Posted on:2016-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:C H RenFull Text:PDF
GTID:2272330470972171Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, the speed of economic development of our country, the people’s living standards have been steadily improving, especially the promotion of people’s safety awareness, making people more and more attention to the construction safety. Compared with other engineering projects, transmission line engineering projects have huge investment, and has a huge impact on the development of local economy.. And in terms of its construction, due to the construction of transmission line project occurs mostly in the wild, facing the external environment is very harsh, personnel, vehicles, materials need in the field, not only the construction cycle long, involving land acquisition, covers an area of the work content, the coordinated difficulty is very great, face the risk is very obvious. Risk management of transmission line is the important content of construction management for transmission line project..Risk management of transmission line project construction stage is studied in this paper. Firstly, the domestic and foreign experts for the study of risk management are introduced and compared. Secondly, the risk management theory of the project is described, and the theory of risk management of transmission line project is introduced in this paper. Again, applying the Delphi method on a transmission line engineering construction stage were risk identification and risk evaluation and the results are discussed and studied in this paper, according to the experts on the transmission line engineering construction stage may encounter all kinds of risk scoring results are the level of risk calculation, mainly with the three aspects of the consequences, frequent degree and possibility of risk to the comprehensive evaluation, according to the quantitative results and the corresponding national risk management standards, judge the corresponding risk management level adjustment, after verification, as evidenced by the modification of a correct judgment. Finally, according to the transmission line engineering construction stage may encounter of different types of risk put forward corresponding measures, make risk management for more explicit and avoid the extensive management of risk management and control ineffective. The analysis of all kinds of risk faced by the construction phase of the transmission line project to explore the corresponding risk management and preventive measures, help similar projects more calmly deal with construction risk.
Keywords/Search Tags:construction risk, risk management, risk factors, risk assessment, risk response
PDF Full Text Request
Related items