Font Size: a A A

Risk Management Of The Building Construction Projects In Developing Countries

Posted on:2020-08-15Degree:MasterType:Thesis
Country:ChinaCandidate:Mohammad Tahir AlemiFull Text:PDF
GTID:2392330623451037Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
One of the real jobs embraced by a task supervisor is the administration or management of a project risk.In any case,this obligation is especially intricate and wasteful if great risk management has not been done from the earliest starting point of the project.Project risk management is a compelling instrument for arranging and controlling cost,time and accomplishing the specialized execution of a building construction project.Construction projects frequently face a ton of vulnerabilities,which places building construction projects at the danger or risk of cost,time overwhelms just as low-quality conveyance.Thinking the incomplete capitals of Afghanistan,there is need to finish building projects on-schedule,on spending plan,and to meet ideal quality.This master thesis offerings an application of risk management in the beginning time of a project life cycle of a building construction project.So as to demonstrate how risk and risk management process is seen,a case study of the Afghan Building construction projects was selected.In Afghanistan constructions are in high demand.All analyses are founded on a theoretical background concerning risk,risk management process,application of risk management and project life cycle approach in the building construction sector.
Keywords/Search Tags:Risk, Risk management, Risk management process, Risk management practice, Project life cycle, Risk factors, Application of risk management
PDF Full Text Request
Related items