Hongyanhe Nuclear Power Station Construction Stage Quality Management Research

Posted on:2015-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:J K L DuFull Text:PDF
GTID:2272330431952248Subject:Business administration
Abstract/Summary:PDF Full Text Request
After the Third Plenary Session of the twelve meeting, with the energy-saving emission reduction strongly advocated, energy structure adjustment, the state of nuclear power development policy has shifted from "moderate development of nuclear power" to "actively promoting nuclear power construction".In this paper, the construction quality control and management Hongyanhe Nuclear Power Plant as research object, based on the research on domestic and foreign literature, carries on the discussion and the research of system construction and the key link of quality management system, describes the process of nuclear power plant construction on the quality management and quality control activities.Firstly, introduces the background and situation of the development of nuclear power development in China.Secondly, the construction stage of quality management of nuclear power plant project basis, design ideas, and use of the nuclear power station nuclear security defense in depth in the design at the same time, the nuclear power plant construction period of the quality management on the basis of conventional thermal power construction project quality management on the basis of comparison, the management of nuclear power plant quality management in the quality management system system planning and multilayer capital, defense in depth of quality control, supervision system.Thirdly, to analyze the characteristics and the influence of quality management Hongyanhe Nuclear Power Engineering and nuclear power station main factors in construction stage of engineering quality management, focus on "people, machine, material, method, five major requirements" and "advance","things","after" three stages of research, focus on the exploration of control process, control means and control method.Fourthly, combining the Hongyanhe Nuclear Power Plant project, the construction stage of quality management system and the quality control of construction process for statistical analysis.Fifthly, put forward countermeasures and suggestions in the construction stage of quality management, puts forward the implementation of quality target system, risk analysis and control, quality development and optimization of the whole course of construction quality management and control, the implementation of quality cost control, application of quality management tools, to carry out benchmarking team construction and QC group activity, countermeasures and suggestions.Finally, summarize the thesis, emphasizes the construction of the construction site quality assurance system and quality management system, the implementation of total quality management, quality problems nipped in the bud, ensure the quality of nuclear power plant construction.
Keywords/Search Tags:Nuclear power project, Construction, Quality management
PDF Full Text Request
Related items