Font Size: a A A

The Equipment Management System Of National Power

Posted on:2014-07-22Degree:MasterType:Thesis
Country:ChinaCandidate:C ShiFull Text:PDF
GTID:2268330425977701Subject:Software engineering
Abstract/Summary:PDF Full Text Request
State Power Corporation as a large state enterprises, the rapid development of business, the rapid expansion of various resources, particularly in the resource type devices constitute the growing complexity of managing the assets of the enterprise has brought a lot of inconvenience and a serious challenge. Currently,The management equipment stock inventory is not complete, incomplete accounting of asset valuation, asset unreasonable standards, regulatory responsibilities are not in place and other issues, which resulted in the loss of corporate assets, idle waste of such phenomena have occurred. In addition, the State Power Corporation of sites scattered throughout the country, you want to achieve co-ordination around the equipment asset management. For this situation, the paper from the asset management efficiency and improve the quality objectives and requirements, make full use of modern information technology advantages, combined with the actual situation, the development of the ability to run on the internal network asset management system. This paper focuses on the following work:In the first, the national power company equipment management system needs analysis. From the functional requirements, performance requirements and security requirements in terms of equipment asset management system requirements specification.In the second, The national power company’s asset management system for the detailed design. Main planning the system architecture and functional framework, given the system’s network topology. Specific design of technical facilities maintenance, technical data management, site operation and management, monitoring center building operation management, system management module, and approval flow module, but also on the detailed design of the system database. Among them, the approval flow module design, the use of JBPM business process management technology.In the third, The national power company asset management system for the concrete realization. Concrete realization of the equipment purchase plans, equipment management, equipment calibration and maintenance, technical data management, site, basic information management, site operation management, site maintenance case management, monitoring center building information management, systems management and approval of transfer of such functions. Finally both from a functional and performance test the system, test results are given.
Keywords/Search Tags:Asset management, SSH integration, Date base, Design andimplementation
PDF Full Text Request
Related items