Font Size: a A A

Design And Implementation Of The Project Planning System Based On GJB5000A

Posted on:2014-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:C LianFull Text:PDF
GTID:2268330422951981Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the continuous progress of computer technology, the size and complexityof the software has also been greatly improved. Military software has become animportant part of weaponry to improve software quality, stability and efficiency ofdevelopment effectiveness as weapons play a strong guarantee. In this context issuedby the General Armament Department GJB5000A (Military Software CapabilityMaturity Model) specification of military software development process, improvemilitary software development level.GJB5000A standard proposed framework for the project planning processthreshold, does not tell us how to complete the framework functions. Based on thisframework as the basis authors develop a set of evaluation and management ofmilitary software development procedure of project planning system.Projectplanning system mainly using Browser/Server model design, developmenttechnology selected is J2EE, and combined with SSH (struts+spring+hibernate)frameworks and JBPM workflow engine technology development, database selectedis Oracle, Web server selected is Tomcat, spreadsheets generated using OWCcontrols to achieve.Firstly, based on project planning process GJB5000A provisions to conductneeds analysis, determine the functions of the role of information systems anddetermine various aspects of the project planning process of functional. Then,project planning systems design and implementation, project planning processincludes data management plan, WBS, project estimation, project tracking, resourceplanning, stakeholder plans, measurement and analysis plan, SCM plan, SQA plan,edit the document and evaluation and other aspects of JBPM workflow technologythrough the use of JBPM project planning tasks will establish contact links andeffective implementation of the system business process management.This systemnot only contains the project planning process and increase the project managementand project planning of two links. Which part of the project is estimated from thesize, workload, schedule, three aspects of the project was estimated measurementand analysis plan contains six tasks of sub-processes. Finally, from the two aspectsof function and performance of the completed system test, the system test results canbe seen that the function of this system is normal, stable performance, to meet theGJB5000A requirements of the project planning process.At present, the system has been in a research institute affiliated to the instituteof applied widely.
Keywords/Search Tags:GJB5000A, Project planning, Project estimation, JBPM, ProcessManagement
PDF Full Text Request
Related items