Font Size: a A A

Design And Implementation Of Software Project Management System Based On GJB5000A

Posted on:2018-04-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y L TianFull Text:PDF
GTID:2438330602459393Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In recent years,the quality of software has aroused concern,and our country has begun to implement software process improvement work,which requires the overall upgrading of software research and development capabilities,improve the quality of software,GJB5000A came into being.Software project management system based on GJB5000A,combined with the software development process in the project management activities into fine project management concept,provides a flexible and efficient working interface and project view for software developers and managers at all levels;at the same time combined with the unit product characteristics of the industry,with dense,grading protection,system three separate functions,comply with confidentiality qualification inspection requirements.To achieve full control of the software project development process and quality,improve management efficiency,reduce management costs,avoid the risk of the project,guarantee the project quality objectives,to enhance the overall ability of developing software organization.In this paper,on the basis of GJB5000A standard,the full analysis of management process and development mode of the software,demand for tools and software engineering management process,the design and implementation of software project management system based on GJB5000A.Detail from the research background and development status,system requirements analysis,system design,detailed design,system implementation,combined with the practical application of the functional division of the system,and the project definition,project planning,project tracking,risk management,project overview and other key function modules in detail introduce the implementation process.Finally,according to the actual business logic of the system on the implementation of the system of the test,the test results show that the function and performance of each module meets the design requirements and can meet the various needs of the user,good performance.The software system of research on the technology using the SSH framework,J2EE technology specification of Oracle 11g database and EXT4 interface development technology based on the convenience of the application of advanced technology,the stability of the system and using.At present,the system is well applied in this unit and has very good value in industry promotion.
Keywords/Search Tags:Software engineering, Project management, Data base
PDF Full Text Request
Related items