Font Size: a A A

The Planning And Realization Of Project Management Of BOC Software

Posted on:2014-06-06Degree:MasterType:Thesis
Country:ChinaCandidate:A Q LongFull Text:PDF
GTID:2268330401967764Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Software project management conducive to the developer’s personal developmentcapabilities into the enterprise development capabilities. In order to further improve theunified management of the software project processes and resources, morecomprehensive and effective service to the software development process and thewealth of library management, to better facilitate the process of software developmentmanagement, development of software project management system is very necessary.Able to fit the company’s software development process; each stage of progress in theeffective management of the software development process; BUG, provide real-timetracking of project development process open and access control of the company’swealth of library resources. Shorten the progress of software development, and improvethe quality of software products, effective maintenance of the corporate wealth oflibrary resources.In this thesis, relying on the Bank of Communications, a software projectmanagement system, including basic project information management, developmentmanagement, quality management, post implementation management, and personalmanagement function module. Vs2005tools developed in this article use ActiveXcontrols, and its essence is a COM component analysis the ActiveX plug operatingmechanism, the preparation of the B/S structure to guide software project managementsystem based on ActiveX. Complete software automatically download and install theupdate and enterprise information management. LAN test, to good effect.In a word, using the software engineering, design patterns, automated testing andthe agile process management ideas and methods of the entire banking software projectmanagement system from the analysis, design, implementation, testing, assessment ofeach process for all aspects of coordination and control, from the Angle of methodology,to look at the system’s life cycle, harvest quite abundant. Eventually the operation of thesystem has reached the expected requirements and effect, the test results are satisfactory.Although there are still many deficiencies, I hope the future can to perfect this system, in order to achieve more satisfactory results.
Keywords/Search Tags:Department of Software Project Management, ActiveX technique, B/S structure
PDF Full Text Request
Related items