With the continuous development of the catering industry,the further refinement of the catering industry has become the trend of the future development of the catering industry.Different catering ways have significant differences in the way of management and the way of management.Among them,college canteen catering compared with other catering has extremely distinctive uniqueness.It serves a special group of people and has a stable market.At the same time,it has received relatively strict restrictions in price adjustment,safety and health and many other aspects.Besides,it has certain social welfare and many other factors,which make it difficult for it to expand its business and compete with other restaurants freely through publicity,marketing and price adjustment.Therefore,the cost control of college catering is particularly important,and it is also an important aspect of college catering management that needs to be emphasized.Currently,the cost control methods used by the branch of Quzhou College are relatively basic,lack of detailed investigation before operation,and have not sorted out the latest market information;Lack of effective monitoring in the operation,although the release of relevant system requirements but not implemented to the specific links and responsible person;The analysis of differentiated data after operation is not standardized,ignoring that cost control is a series of continuous and circular processes.This paper takes the branch of Quzhou University as the research object,starts from the actual situation of the enterprise,and takes cost control as the starting point to carry out the research.First of all,on the basis of the brief introduction of the relevant theories and tools of cost control,combined with the actual situation of the enterprise’s own cost control,analysis and summary of the current existing problems in cost control,and analyze the reasons;Then,using the relevant theoretical tools,according to the causes of cost control problems,give practical solutions;Finally,it adds the guarantee required for the concrete implementation of the solution. |