| "Efficiency" in today's world economy is crucial,any a project started,implementation,ending,need higher efficiency.Otherwise,all aspects of the project to the deviation,it will affect the project schedule,resource,quality controllable.The material support is the important link in the management of the equipment manufacturing enterprise in the large equipment manufacturing enterprise,and it is a subject to study how to improve the supporting efficiency of the material.This article through to the project plan and control the thinking of comb,expounds the contents,methods of project planning and control,as a theoretical guidance for the following case analysis.Through the analysis of specific case project plan,to get the required project plan,to form a complete set of supplies management analysis embedded in the project plan,project plan to form a complete set of materials management,material management analysis of form a complete set and reflected in the project plan management.Nuclear demonstrative project of this example is analyzed in this paper,the countries:on the nuclear demonstration project for the project description,and the main module structure description.Through the introduction of the whole and local interests,choose the high pressure rotor set as project plan analysis set.Through to the high pressure rotor ministry set of job descriptions,work breakdown,working relationship description,such as work,preparation of network planning,project plan is obtained.Form a complete set of materials is obtained by high pressure rotor project plan,the key work-roulette procurement.Through analyzing the roulette procurement plan,it is concluded that the gantt chart of roulette purchasing plan.Using the regular check for suppliers,through the gantt chart plan comparison,found a discrepancy between supplier production schedule and planning.Deviation of roulette tempo,process,resources were analyzed,and the redistribution of resources,making new progress control table,make its basic conform to the requirements of the original plan.In this paper,the material supporting project management method before and after the project meeting to complete the rate of the project and the completion rate of the project to demonstrate the material supporting the project management results.This article supplies supporting analysis method,for large equipment manufacturing industry represented by the steam turbine industry has a certain reference value. |