Research On Progress And Quality Management Of Base Station Construction Project Of A Telecommunication Wireless Network

Posted on:2021-05-06Degree:MasterType:Thesis
Country:ChinaCandidate:C J LuFull Text:PDF
GTID:2428330626455722Subject:Engineering
Abstract/Summary:PDF Full Text Request
Information transmission technology is one of the three symbol technologies in the information society.The development of "optical cable,cable and wireless transmission engineering technology" determines the development process of the whole communication network.Especially in today's "three networks integration" development strategy proposed by the state,as the basis of "three networks integration",high-speed information transmission lines will promote the engineering design,construction and construction of optical cable,cable,wireless and integrated wiring lines into a new climax.In order to comprehensively promote the strategy of "three networks integration" and realize the grand goal of "broadband China",under the premise of the current 5g era,company a has made a reasonable layout and scientific development,strengthened the construction and maintenance of communication infrastructure,and decided to start the construction of a new batch of LTE base stations,so as to meet the needs of current communication technology and growing user demand.This paper selects the base station construction project of a telecommunication wireless network as the research object,supplemented by the actual case of "base station construction project of 800 m LTE wireless network in A ba Prefecture,such as Yangjiawan in Jinchuan",and puts forward the discussion and analysis of two modules of project schedule and quality management from the perspective of modern project management.This paper attempts to use WBS,network planning technology,project software,fish bone diagram,checklist and other tools to carry out scientific planning and control of the project progress;at the same time,it also uses causal analysis,flow chart,histogram and other methods to guarantee and control the quality of the project,so as to ensure the progress and quality of the whole project,so as to improve the management efficiency of the whole base station construction project Benefit.The research and analysis of the paper is divided into six parts: first,the background and significance of the research,the main content,methods and framework of the research;then,the theory and methods are studied,including the research trends at home and abroad are collected and sorted out;then,with the help of WBS and network planning technology,the progress of a Telecom wireless network base station construction project is planned and analyzed Control analysis,and put forward the relevant progress guarantee measures;then with the quality plan,assurance and control as the leading idea,with the help of quality management methods and processes,the paper establishes the control strategy of the project quality in advance,in the process and after the event;at the same time,it also tests and analyzes the project quality in the way of histogram,and determines the quality of the project The last part is the conclusion of this paper.Generally speaking,the paper puts forward the research on the progress and quality management of the base station construction project of a Telecom wireless network,which to a certain extent meets and meets the needs of Sichuan Telecom Company and a company in the current implementation of the project construction management,and also plays an important role in promoting the project management level of communication engineering construction in this region,with important theoretical value and practical value Significance.
Keywords/Search Tags:A base station of wireless telecommunication network, construction project, schedule management, quality management
PDF Full Text Request
Related items