Font Size: a A A

Research On The Risk Management Of The 4-6 Old Neighborhood Wireless Local Area Network In Shanghai,Changning District

Posted on:2019-10-16Degree:MasterType:Thesis
Country:ChinaCandidate:J Y MaFull Text:PDF
GTID:2428330605475290Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of China's social economy,the great progress of the global core information technology and the requirement of the higher level of information transmission,the wireless broadband network has been greatly improved.Now,the construction of China's information and communication technology has developed rapidly,the gradual emergence of IP,as well as the characteristics of wireless broadband,wireless city construction has become a symbol of the development of the new city information.In this environment under the guidance of the old district of Shanghai city as part of the transformation of an important part of the Changning District 4-6 old neighborhood WLAN project also gradually being put forward,it also brings great convenience to the people of Shanghai the information of life,provided strong guarantee for the economic development of Shanghai,make the wireless ubiquitous network play a hidden but essential roleThis paper will introduce the theory and method of project risk management,and closely attached to Shanghai city Changning District 4-6 old neighborhood i-shanghai wireless broadband metropolitan area network construction project management practice,through the use of risk management information project scientific and normative,forward-looking and reasonable plan,achieve risk monitoring in place,effective measures,in order to Shanghai Changning District City,the old 4-6 the neighborhood of wireless local area network construction project implement better.Through combing the risk management system,summarize and discuss the risk response.This paper mainly discusses the contents include:Based on the domestic research results,combined with the actual situation of the project construction,determine the risk management process;in the city of Shanghai Changning District 4-6 old neighborhood wireless local area network construction projects on the basis of risk analysis,develop risk management plan.Through the analysis of historical data,using the risk probability and impact matrix method of technology,market,capital,construction process,organization and human resources,policy,cooperation,environmental protection and other aspects of risk from risk identification,risk assessment and risk control three aspects to elaborate,and established a risk assessment a comprehensive project,put forward the method of risk control,risk control effect summary.
Keywords/Search Tags:Wireless local area network construction, Risk management theory, Risk identification, Risk assessment, Risk Management
PDF Full Text Request
Related items