Font Size: a A A

Research On The Risk Management Of The Implementation Of The Mobile Internet Prize Invoice Management System Project In City L

Posted on:2021-05-13Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2428330602983635Subject:Project management
Abstract/Summary:PDF Full Text Request
In the context of China's strong and rapid economic growth,the rapid development of mobile Internet projects has benefited from the state's rapid increase in capital investment in project research and development,especially the introduction of the"Internet+" concept,which has gradually made traditional industries gradually offline.Moving to online,through the integration of information technology,many system service platforms,software products,and new mobile Internet development models have been generated,which has accelerated the rapid development of society and improved daily work efficiency.However,the completion rate of mobile Internet projects exists.The problems of low,project delays and even failures are becoming increasingly prominent.How to scientifically and effectively manage the risks of mobile Internet projects,reduce project implementation risks,increase project completion rates,and reduce project losses are gradually becoming important topics of concern for enterprises and institutions today.As mobile Internet is a new industry that has just emerged recently,China's research on risk management of mobile Internet projects has started a bit late.More research is currently focused on real estate,large-scale engineering projects,etc.,while the research on risk management of mobile Internet projects is relatively The lack of awareness of risks in the implementation of mobile Internet projects and the incomplete and incomplete analysis of potential risks,and the lack of effective measures to manage and control risk factors,undoubtedly add a lot of uncontrollable factors to the implementation of mobile Internet projects.Risk factors have greatly reduced the success rate of project implementation.Therefore,it is particularly important to establish a risk management system suitable for mobile Internet projects to solve risk problems.Through comprehensive and effective identification and analysis of the implementation risks of mobile Internet projects,the use of risk assessment methods in project risk management theory knowledge for mobile Internet The project's risk factors are comprehensively evaluated,effective countermeasures are proposed for the risk factors identified in the project,and various risks in the implementation of mobile Internet projects are scientifically controlled and managed to achieve the purpose of improving the success rate of mobile Internet project implementation.This article takes the L City Mobile Internet Awarded Invoice Management System project implemented by Company W as a specific example.Based on the current research and methods of risk management theory,it adopts literature data analysis method and brainstorming method to identify the city's mobile Internet award.The possible risk elements in the implementation of the invoice management system project were effectively identified.The city's mobile Internet prized invoice management system project identified a total of 5 categories of risks,including demand,management,technology,information system security,and personnel risks.Etc.,and summarized the risk points in various aspects through an induction method,and constructed a risk list list including 25 risk sub-factors;and then used the analytic hierarchy process(AHP)to comprehensively evaluate the potential risk elements in the risk list list Analysis,according to the results of comprehensive analysis,construct a judgment matrix for each risk category,determine the priority level of each risk factor and arrange them in order;finally,adopt a comprehensive risk management method for the five types of risks in the L Internet Mobile Invoice Management System project,Adopt the most commonly used project risk management and control methods,Risk response strategies including risk aversion,transfer,mitigation,acceptance,etc.,formulate corresponding risk management and control measures for 25 risk sub-factors in the 5 risk categories of the project,and create awards suitable for influencing the mobile Internet in L City The risk solution of the invoice management system project will bring positive reference value for future research on risk management of similar mobile Internet projects.
Keywords/Search Tags:Mobile Internet, Risk management, Risk identification, Quantitative comprehensive evaluation
PDF Full Text Request
Related items