Research On Cost Management Of Main Equipment Installation Project Of Ganzi New Base Strtion Wireless Network

Posted on:2018-05-12Degree:MasterType:Thesis
Country:ChinaCandidate:J ChenFull Text:PDF
GTID:2428330596475882Subject:Engineering
Abstract/Summary:PDF Full Text Request
In order to meet the growing demand for data services,give full play to TD-LTE the first mover advantage to cope with the increasingly fierce market competition,the realization of TD-LTE network construction and business to market demand-oriented,ensure the quality of TD-LTE network,China Mobile Sichuan company launched China Mobile 4G in Sichuan province in 2016 four the first batch of Ganzi new base station wireless network equipment installation engineering.Ganzi new station master wireless network equipment installation project is one of the Ganzi mobile infrastructure construction project,the project is characterized by huge investment,long construction period,a lot of related interests,the whole process is complex.Therefore,the project cost management is particularly important.This paper takes Ganzi new cost management station master wireless network equipment installation engineering project as the research background,based on the cost management concept and theoretical basis,and the application of the current analysis method for total cost management representative theory and earned value.Ganzi new process of cost management in wireless network base station main equipment installation engineering project phase analysis,find the plan of this project cost value of 3802055.79 yuan,the actual total cost of 4046190.7 yuan,exceeding the cost plan value of 244134.87 yuan,exceeding the cost plan value 6.42%.After further analysis that the project cost overruns part is mainly direct project cost cost,enterprise management fees,the cost of equipment and installation of domestic survey and design fees,the main reason is due to the labor,material and equipment prices as a result,on the other hand,because the purchase cost control is not in place and cost control is not in place to cause.This paper analyzes the existing Ganzi new base station wireless network main equipment installation project cost management problems,including the development of the cost of lack of clarity,the design of backward technology can not reduce costs,lack of personnel of construction cost control consciousness,caused by the loss of the completion data increases,the whole process of cost management reflects the lack of existing problems,the main factors the new base station and Ganzi radio network main equipment installation project cost management,including project cost management system is not perfect,the cost control system is not perfect,the cost of backward management mode,aiming at the existing problems and reasons of Ganzi new base station wireless network main equipment installation project cost management,this paper put forward the project cost management system,the use of earned value analysis method of the dynamic control of the whole process of project cost,the introduction of advanced Cost management and cost control methods.Through systematic analysis and Research on the Ganzi new situation of cost management of base station wireless network equipment installation project,to find out the problems existing in project cost management,improve project cost budget,improve the project cost control,promote the construction project cost management informatization and put forward corresponding countermeasures to solve practical problems,and the improvement of enterprise project management system,improve the Ganzi new base station wireless network main equipment installation project cost management level,and can provide a reference for related projects,to promote China's construction project cost management scientific and standardized,has important significance to enhance the level of project cost management.
Keywords/Search Tags:project cost management, total cost management, whole process cost management, earned value analysis
PDF Full Text Request
Related items