Study On Risk Management Of S Company Voice Communication System Project

Posted on:2019-03-04Degree:MasterType:Thesis
Country:ChinaCandidate:D H LinFull Text:PDF
GTID:2428330551957824Subject:Project management
Abstract/Summary:PDF Full Text Request
In terms of engineering risk management,we have made considerable achievements,and theoretical and practical water products have also greatly improved,but we still have a relatively large distance compared with Western developed countries.At the same time,many theories do not apply to us.Only targeted research on the risk characteristics of China's engineering projects can better solve the problems encountered in practical applications.The innovation of this article is mainly to summarize the risk indicators system that combines the characteristics of general engineering projects and IT project projects in the risk management method of voice communication engineering projects,to try to improve the research methods,and to study the project risks more accurately and more directly.The paper analyzed in detail the overall situation of the current risk management of voice communication engineering projects,relied on the system design model of the most commonly used voice communication engineering project system,repeatedly applied and verified in practice,and conducted in-depth research on various impacts related to various risks of voice communications engineering projects.Factors that list targeted solutions.After carrying out engineering project risk analysis on voice communications,specific algorithms are used to quantitatively analyze specific project risks and improve algorithms.Put forward specific algorithms and perform quantitative calculations.The data analysis results show that the result of fuzzy comprehensive evaluation is low risk.This result shows that the development risk of S company's voice communication system project belongs to common risks.Therefore,S company's voice communication system project can be carried out according to plan,but it may be potential for other Risk agility requires active response measures in order to reduce the risk factor as much as possible.In view of this,the article clarifies the risk prevention target before the loss of the S company's voice communication project and the risk response target after the loss.At the same time,in terms of risk prevention,it raised the awareness of risk-awareness among project participants,fully identified and estimated project risks,and formulated measures such as project risk response plans;from the perspectives of voice communication system project risk response measures and voice communication engineering project risk processing and monitoring.Put forward a specific coping strategy for S company voice communication system project risks.
Keywords/Search Tags:voice communication system, risk identification, risk assessment, risk prevention
PDF Full Text Request
Related items