Font Size: a A A

Study On Construction Schedule Management Of LJ Residential Project

Posted on:2020-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y L WangFull Text:PDF
GTID:2392330602961781Subject:Business administration
Abstract/Summary:PDF Full Text Request
In In recent years,with the rapid development of economy in our country,the town of big building have sprung up all over the country and speeding up construction of the project,especially the wisdom cities,sponge,composite pipe rack and other new project pilot and promotion,"new technology,new material,new technology,new equipment," four new technology applications,engineering project contract(EPC),construction general contracting management,optimizing the management,innovation management,and other new project management concept,greatly promote the construction of the engineering construction project.At the same time,the project construction investment(cost)is reduced,quality is improved,construction period is shortened,safety management,contract management and information management level are further improved,construction organization and coordination is more convenient and efficient.First of all,the theory of three-dimensional view of previous researches,this paper(project,organization,schedule 3D)research,fully understand the construction engineering project construction schedule management as an important part of project management,plays a promoting project from the paper level to the project entity,the main function of transition throughout the project implementation phase.Secondly,on the premise of fully demonstrating the rationality of the PROJECT objective,the construction progress control system of the construction PROJECT is established,and the progress plans at all levels and hierarchical management are made by using the traverse chart,network planning technology,PROJECT software and computer-aided measures.Thirdly,the comparison method of the traverse chart and the front line method of the actual progress are used to check the real-time comparison between the planned progress and the actual progress.In the end,the project can be realized smoothly according to the established goals to ensure the perfect implementation of the contract,and at the same time,the valuable project management experience can be accumulated for the enterprise to improve its market competitiveness.
Keywords/Search Tags:LJ residential project, three-dimensional perspective, progress management, actual progress front line
PDF Full Text Request
Related items