Font Size: a A A

Research On Project Risk Management Of SG Ordos Automobile Plate Processing Center Construction

Posted on:2016-04-07Degree:MasterType:Thesis
Country:ChinaCandidate:G M WuFull Text:PDF
GTID:2382330572964809Subject:Project management
Abstract/Summary:PDF Full Text Request
Summary roject Risk Management,refers to all companies involved in the construction project,including the owner,design institutes,construction contractors,supervision units,star ting from the survey of the project,the construction design,the construction project until com pletion and acceptance of the entire stage into the risk identification,assessment projects to d eal with the risks of the measures.That is people identify potential accident losses,evaluate a nd take appropriate measures to deal with the specific circumstances,in the subjective or whe n you can not avoid being prepared can also seek compensation measures as far as practicable,in order to reduce accidental loss or make risk for my own use.Project risk management incl udes risk identification,risk estimation and assessment,risk response and risk monitoring.SG Ordos auto sheet processing center construction project was based on Shougang resources,brand,technology,deep cooperated with the Baotou Steel and end customers Chery Automobile processing and distribution services to meet the needs of Chery Automobi le production base in Ordos branch,expand and secure Shougang car plate products in the ma rket share of Chery Automobile;To build marketing services platform,expand SG Ordos cold rolled flat products in the Ordos and the surrounding area market influence;Established capit al ties by processing centers,in order to further develop the strategic cooperation between the SG and Baotou relations,and complementary advantages.As the project is facing time limite d,short of capital and high quality requirements,so it is very important to regnize potential risks.This artical using expert investigation,AHP and scenario analysis combining the project f or risk identification;risk assessment methods using a combination of qualitative and quantita tive risks for risk assessment of the project to construct SG Ordos auto sheet processing cente r risk assessment model of construction projects;then the transition from ex ante estimate the risk to process control,the various stages of pre-project,construction of the building and othe r risk response and prevention strategy of the sort;for SG Ordos auto sheet processing center construction project early and construction of the medium-term risks that may be encountered design corresponding risk response measures to reduce the loss to reduce or eliminate the ad verse effects of the project risks.
Keywords/Search Tags:construction projects, risk management, risk assessment, risk response
PDF Full Text Request
Related items