Font Size: a A A

A Case Study On Improvement Of Changing Process Of Standard Product Information Of Company S

Posted on:2016-07-21Degree:MasterType:Thesis
Country:ChinaCandidate:D LiFull Text:PDF
GTID:2349330482966722Subject:Business administration
Abstract/Summary:PDF Full Text Request
Recent years, with the high-rapid development of urbanization process, the low-rise buildings have been unable to meet the requirements of housing. The high-rise buildings have been the flagship product of real estate. As the essential special equipment in the buildings, the market demand of elevators always keeps increasing. However, the foreign and domestic markets have been changed. The foreign elevator brands can never been the top one. Lots of foreign competitors run into Chinese market. National competitors are also not outdone. They want to get the potential with a slice of this action by continuous improvement and their own advantages.Elevators belong to one kind of special equipments. It is famous for its unique complexity of design and installation. Any little change can cause the changes of parts of elevators. All sorts of factors make the elevator products become more complicated. The differentiation of product demand is increasingly prominent. So how to meet the needs of customers, how to make the timely and accurate feedback to the market, how to develop occupancy in the competitive marketplace. The answers what can solve the problems above become the key of enterprise's development, and also the powerful protection that enterprises can obtain competition advantage.This paper is going to illustrate the current status of process of standard product information changes in Company S, by using Process Management, Business Process Improvement, ACE related theories and ACE tool for process management in order to find the reasons of affecting process and provide the methods of solve the problems and safeguards what can support the process goes well. To ensure the smooth implement of the standard product process improvement activities, the paper further puts forward the safeguard measures what should be implemented.This case of company S has a certain universal and representative in elevator industry. It is hoped that some of the studies and the solutions from this paper could be used as a reference in elevator industry of China in the competitive market environment.
Keywords/Search Tags:Process, Process Management, Business Process Improvement, ACE
PDF Full Text Request
Related items