Project Schedule Risk Analysis Of A TFT Electronic Factory Building In Chongqing

Posted on:2017-08-10Degree:MasterType:Thesis
Country:ChinaCandidate:M ChuFull Text:PDF
GTID:2348330566956618Subject:Engineering field
Abstract/Summary:PDF Full Text Request
In recent years,Chinese LCD industry is at an unprecedented speed in the rapid development,and the mainstream of TFT panel production industry rapid rise,in the promotion of the expansion of production capacity,delivery of goods and technology with great stride.In the physical construction is mainly reflected in the many well-known LCD panel production enterprises have put into operation in the country to build their own large-scale TFT plant.Due to the rapid development of industrial development,the product due to the rapid development of industrial development,product market demand is huge,the construction side eager to put into operation to seize the market,the actual construction project duration pressure is more and more big.Once the project if in construction appeared extended the progress,to the construction side of the project and the construction side at the same time,it brings a lot of risks and losses.The purpose of this paper is to analyze the progress risk of this kind of plant construction,and to find the appropriate measures to deal with the risk.Strive to in the project construction progress lieutenant general risk occurrence probability is reduced as far as possible,degree of influence as far as possible to reduce,to avoid due to the progress of the extended losses caused.The schedule risk analysis,first find out where the TFT electronic factory construction project in the common risk factors in the schedule list,and event tree method to classify it,and the establishment of a relatively perfect schedule risk analysis model,through to similar project risk occurs effect probability and the size and the resulting loss of qualitative analysis and quantitative analysis,and according to the practical experience that dressing risk matrix,obtained a list for the estimation of all kinds of risk factors and,ultimately,the overall risk of the project evaluation.The purpose of this paper is to provide a theoretical basis for the control and decision-making of the project managers in the future similar engineering project management by studying the progress risk management of a certain TFT electronic factory building project in Chongqing.Through the risk factors in project management in this paper put forward specific strategies of risk management,for the future of the engineering project management development schedule risk preventive measures to provide a reference.In the progress of the project risk management with more scientific management methods to achieve the purpose of reducing risk or transferring and dispersing risk,better to complete the project schedule management.
Keywords/Search Tags:Electronic factory, schedule risk, management, construction project
PDF Full Text Request
Related items