Font Size: a A A

Design And Implementation Of Power Company Engineering Auxiliaryturn-owned System

Posted on:2017-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:S ZhuFull Text:PDF
GTID:2348330515965264Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Project auxiliary information system is the tianjin electric power company,according to their own internal need to strengthen management,and the project was to develop a ERP management system.Research and construction of the system to get the company leadership attaches great importance to,and get the resources construction of support.Engineering assistant for system is mainly to solve the existing various management problems that exist in the ERP system,such as the information gap between the various departments,business island,horizontal regulatory problems.And require the use of "three yards" automatic matching method,further improve the efficiency of information management related.Material code assets,equipment coding,coding standard highly unified,the three yards automatic matching and transformation is the objective of the research focus.Synchronization,combining project process management,process management of engineering material plan,project construction,completion inspection and acceptance,project management,engineering settlement,project final accounts of the six parts of the system function has carried on the detailed requirements analysis,system design,code development and related system test.Each part includes several tall function module design and implementation.This project mainly technology adopted the company's existing various techniques of ERP system,including the SAP ABAP code development,Oracle database system,ERP system management technology,etc.Through more than a year of system research and development of the code,the system is running successfully.After the user environment during the period of strict internal technical testing and commissioning test.Finally,by the user and the project of joint confirmed,through formal acceptance of the project.At present,the business system runs stably and can meet the needs of business operations.
Keywords/Search Tags:Assist Management, Project Process ManagementManagement, ERP, Three Kinds Of Coding, Database Technology
PDF Full Text Request
Related items