In recent years, Chinese has become the global production base of electronic products, electronic processing enterprises in the production of products, its SMT equipment cost, quality, quantity and use are closely related. If the SMT equipment is in a bad state, transmission, production will be affected, especially for large pipeline is blocked, as long as a link, other processes will be involved, beat down, halt production, even production order is likely to be affected. The SMT placement machine equipment maintenance project management has not formed a system of research, in the research of project cost, quality, schedule, still need to be strengthened. This leads to frequent delays in completion, unreasonable project, cost is too high cost phenomenon. Application and innovation of project management is the fundamental guarantee for the normal operation of equipment, as the electronic research core national technology, study the SMT machine maintenance project management is very necessary and practical significance.Beijing electronic application research institute, the author of this paper SMT equipment maintenance of the project schedule control, cost control and so on analysis, quality control to the existing problems and the application of the theory and the thought of project management to the SMT equipment maintenance project management, use the method of project management to guide the project. Main research contents focus on the following aspects:(1) this paper introduces the features of SMT equipment maintenance support project, life cycle, this article introduce the process of the demand recognition highlighted the need to identify in the importance of the project, and summarizes the general project planning process. Finally illustrates in the actual project and suitable organizational structure is adopted in the equilibrium matrix organizational structure. Combined with Beijing institute of electronic application SMT equipment annual maintenance plan and control process of the project, the project management plan control method in the effective use of SMT equipment maintenance program. With network planning laws optimization finally out of the project implementation process under the lowest cost in the cost of the shortest time limit for a project to ensure normal in the SMT equipment maintenance project.Through a combination of in Beijing institute of electronic SMT equipment annual maintenance projects, demonstrates that after the implementation of the project management, for the actual project progress control provides a powerful guarantee, at the same time also for the project cost optimization analysis for the project provides a reference for the final, using the risk control to smooth implementation of the project provides a strong guarantee. At the same time also on equipment maintenance work for the future guidance and advice are put forward.
Keywords/Search Tags:SMT pick and place machine, project management, schedule control, cost control, network calculation method
PDF Full Text Request
Related items