Font Size: a A A

Design And Implementation Of Business Plan Management System For Dalian Architecture Design Institute

Posted on:2017-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:L X MengFull Text:PDF
GTID:2348330488958449Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The comprehensive plan management system's target is for the best institute resource configures by integrating the plan, the management, the control and the communication. The comprehensive plan management system can improve the efficiency of the institute resource using and provide the science date resource for institute management and decision-making.With the collaboration between the various departments in an institute becomes increasingly close and frequent, it requires a technique to organize and coordinate interaction between the various departments. In addition, In the face of increasingly fierce market competition and changing market, institutes also need to have more flexibility to quickly adjust their business processes for business restructuring. Software systems must have more flexible business processing mechanism to support business changes according to demand.First, starting from researches of background and current situation, the thesis describes the significance of the research, analyzes the popular workflow framework and compares their characteristics. All of these lay the foundation for the choice of technology. Second, UML modeling technology is used to model the architecture of the system. There are three model views:case models, class models and activity models. These models are used to describe function design, static structure design and dynamic behavior design of the entire software respectively. Finally, the implementation of the system is completed.The comprehensive plan information management system has provided an information platform for institute's comprehensive plan management. The platform supports the whole institute plan management action, and provides the designer of user-defined plan template, the check of the special plan has been filled, the evaluation with choosing the excellent function of the comprehensive plan. The platform can meet with complex plan management of the institute, and thus truly improved institute group plan management.
Keywords/Search Tags:Comprehensive Plan Management, Workflow, Case model
PDF Full Text Request
Related items